A company rents a frame relay line with 1 Mbps CIR from the carrier. But the line is unstable and flapping frequently. The network administrator finds that the CIR value is not configured on the router. After correcting this error, the line will become stable.

Posted by: Pdfprep Category: H12-261-ENU Tags: , ,

A company rents a frame relay line with 1 Mbps CIR from the carrier. But the line is unstable and flapping frequently. The network administrator finds that the CIR value is not configured on the router. After correcting this error, the line will become stable.
A . TRUE
B . FALSE

Answer: B

Leave a Reply

Your email address will not be published.