-25%
$59.99
Save 25% with Coupon Code "pdfprep"
Lean Six Sigma Green Belt
Premium Q&As: 162
Version: PDF
Last update: September 26, 2023
Last Week Results!
Related LSSGB Questions & Answers
- The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.
- As part of a Visual Factory plan Kanban cards are created and utilized to identify areas in need of cleaning and organization.
- A Belt will occasionally do a quick experiment referred to as an OFAT which stands for ____________________.
- The Purchase Orders for Glenn Manufacturing Company were being copied by an employee and sent to four different departments yet only one department took an action based on the information in the PO. This is an example of ____________.
- The Purchase Orders for Glenn Manufacturing Company were being copied by an employee and sent to four different departments yet only one department took an action based on the information in the PO. This is an example of ____________.
- If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
- Examples of a Visual Factory include which of these? (Note: There are 2 correct answers).
- Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.
- A Six Sigma tool that helps to screen factors by using graphical techniques to logically subgroup multiple discrete X’s plotted against a continuous Y is known as a _____________Chart.
- Cost of Poor Quality (COPQ) can be classified as either Tangible (Visible) Costs or Hidden Costs.
- When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are ___________ correlated?
- Which statement(s) are true about the Fitted Line Plot shown here? (Note: There are 2 correct answers).
- Standardized work instructions apply to which resource in the process of interest?
- Customers make a purchase decision based on a number of factors. In Lean Six Sigma we refer to these decision points as CTQ’s which stands for __________.
- SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.
Reviews
There are no reviews yet.