-25%
$59.99
Save 25% with Coupon Code "pdfprep"
HCIA-Data Center
Premium Q&As: 122
Version: PDF
Last update: September 20, 2023
Last Week Results!
Related H13-411-ENU Questions & Answers
- Which of the following are in the server virtualization range?
- Which of the following statements regarding Huawei AR series routers are true? (Multiple Choice)
- Which of the following roles is not a user role of the e Backup?
- Which of the following is not a backup image verification state in the e Backup?
- Which of the following are included in the hardware of a DC? (Multiple Choice)
- Which of the following are included?
- Which of the following functions does the Manage One OperationCenter provide?
- Which of the following statements regarding Huawei eSight is false?
- If an engineer adds hosts for a site in the FusionCompute but does not deliver VMs, the engineer can still selector deselect Connect to OpenStack.
- Which of the following are internal components of the e Backup? (Multiple Choice)
- Which of the following are included in the basic software of a DC? (Multiple Choice)
- Which of the following is not a backup image verification state in the e Backup?
- Fusion Module 2000, the next-generation smart modular datacenter solution developed by Huawei, can be applied in medium-and large-scale DCs. It can be used as an independent equipment room to carry network services, or be used as a regional equipment room affiliated to a large modular DC to carry partial or regional services.
- Which of the following protected environments can be managed by the e Backup? (Multiple Choice)
- Which of the following statements regarding LB management in the Agile Controller -DCNV3R 1 are true? (Multiple Choice)
Reviews
There are no reviews yet.