Posted by: Pdfprep
Post Date: December 1, 2020
An engineer is deploying a Cisco Nexus 1000v into VMWare vSphere using the OVA fie. The engineer deployed the VSM virtual machine in vCenter and completed the initial setup script of the VSM. Which two additional configuration steps are needed to implement the 100GV? (Choose two)
A . Configure an SVS connection to vCenter in the console of the 1000
C . Add hosts to the distributed virtual switch in vCenter.
D . Add hosts to the distributed virtual switch in the console of the 1000
F . Add the 1000v as a virtual distributed switch in vCenter.
G . Configure an SVS connection to vCenter using the vCenter wizard.
Answer: A,B
Leave a Reply