Posted by: Pdfprep
Post Date: November 12, 2020
DRAG DROP
You are developing a SQL Server Analysis Services (SSAS) tabular project based on a Microsoft Azure SQL Database database. The ProcessingOption property for the project is set to Do Not Process. Several calculated columns have been added to a table. The project has been deployed to the production server. You need to ensure that newly added data is processed on the production server.
Which three actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
Answer:
Explanation:
* To process a table
Leave a Reply