Posted by: Pdfprep
Post Date: November 17, 2020
After an SRDF failover operation, production work has been moved to the remote site. A large number of invalid tracks have accumulated that need to be synchronized back to the R1 volumes.
Which SRDF operation can reduce the re-synchronization time, while continuing production work on the remote site?
A . Update
B . Failback
C . Restore
D . Establish
Answer: A
Leave a Reply