Posted by: Pdfprep
Post Date: November 16, 2020
During a scheduled outage of the primary site (R1), a company is operating their production on their disaster recovery site (R2). After the outage, they need to move production back to the R1 site.
Which SRDF action is required?
A . Failback
B . Restore
C . Resume
D . Failover
Answer: A
Leave a Reply