How should a Synergy integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?

Posted by: Pdfprep Category: HPE0-S50 Tags: , ,

Refer to the exhibit.

How should a Synergy integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
A . Interconnect bays 1 and bays 2: bays 3 and 4: bays 5 and 6.
B . Interconnect 1 bays 1 and 4: bays 2 and 5: bays 3 and 6.
C . Interconnect bays 1 and 1 and 6: bays 2 and 5: bays 3 and 4.
D . Interconnect bays 1 and 3: bays 2 and 4: bays 5 and 6.

Answer: B

Explanation: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf (13)

Leave a Reply

Your email address will not be published.