Posted by: Pdfprep
Post Date: October 14, 2020
One activity in managing requirements includes prioritization of the requirements.
Which of the following criteria is not a sensible criterion for prioritization? (1 Point)
A . The impact on the existing operational system (operating environment)
B . The influence on the overall success of the business
C . The effort for the validation of the requirements
D . The costs resulting from the implementation of the requirements
E . Which requirements must be implemented in which release
Answer: C
Leave a Reply