Posted by: Pdfprep
Post Date: November 3, 2020
Scope, schedule, and cost parameters are integrated in the:
A . Performance measurement baseline.
B . Analysis of project forecasts,
C . Summary of changes approved in a period,
D . Analysis of past performance.
Answer: A
Leave a Reply