Drag and Drop Question

Posted by: Pdfprep Category: 300-175 Tags: , ,

Drag and Drop Question

This question concerns the installation of a Cisco Unified Computing System blade server AC power supply.

Drag the options on the left to the right side in the correct order when performing the installation. Note: Not all of the steps on the left will be used.

Answer:

Leave a Reply

Your email address will not be published.