Using the default VDC high-availability options in the Cisco Nexus 7010 switch, which event occurs after a VDC failure?

Posted by: Pdfprep Category: 300-165 Tags: , ,

Using the default VDC high-availability options in the Cisco Nexus 7010 switch, which event occurs after a VDC failure?
A . VDC restart occurs.
B . The VDC is deleted.
C . VDC bringdown occurs, and the VDC must be restarted manually.
D . VDC shutdown occurs, and the VDC must be restarted manually.

Answer: D