Which three actions should you perform?

Posted by: Pdfprep Category: 300-165 Tags: , ,

You have a Cisco FabricPath network. You must implement vPC+ for a downstream switch.

Which three actions should you perform? (Choose three.)
A . Configure the switch ID on the peer switches.
B . Configure a peer keepalive between the peer switches.
C . Connect the downstream switch to a 10-Gb port.
D . Configure the upstream switch to use PagP on EtherChannel.
E . Establish a peer link between the peer switches.
F . Configure the downstream switch to use PagP on EtherChannel.

Answer: BCE