Posted by: Pdfprep
Post Date: January 6, 2021
An EMC NetWorker administrator notices that clients are being backed up one at a time, even though they are scheduled to start simultaneously.
What may be a cause of this?
A . Server parallelism is set to 1
B . There is only one volume labeled
C . Client parallelism is set to 1
D . There is only one pool configured
Answer: A
Leave a Reply