An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment

Posted by: Pdfprep Category: HPE0-S58 Tags: , ,

HOTSPOT

An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment.

Click where the integrator should verify that the cabling for the management ring was completed correctly.

Answer:

Explanation:

Reference: https://support.hpe.com/hpsc/doc/public/display?docId=a00048164en_us

Leave a Reply

Your email address will not be published.