Based on the design shown, which changes need to be made to the configuration to ensure high availability?

Posted by: Pdfprep Category: HPE0-S58 Tags: , ,

A customer has received a second frame for their HPE Synergy environment. The customer has added the second frame to the rack and correctly cabled the power and management ring.

Based on the design shown, which changes need to be made to the configuration to ensure high availability? (Choose two.)
A . Split the management uplinks across both frames
B . Configure high availability in vCenter for the HPE OneView appliance
C . Configure high availability on the Frame Link Modules
D . Enable high availability in the Settings of the Composer
E . Move one of the Composers to the second frame

Answer: AC

Explanation: