What is the correct value to use in the Elapsed Time Interval field along with the Elapsed Time Attribute?

Posted by: Pdfprep Category: C2010-555 Tags: , ,

An administrator want to create a time based escalation point to evaluate to 30 days in the future.

What is the correct value to use in the Elapsed Time Interval field along with the Elapsed Time Attribute?
A . Today + 30
B . Sysdate + 30
C . +30 (positive 30)
D . -30 (negative 30)

Answer: C

Leave a Reply

Your email address will not be published.