Posted by: Pdfprep
Post Date: November 5, 2020
As shown in the figure, the two core switches set up a VRRP group and run BFD for VRRP. The BFD feature can shorten the VRRP master/backup switchover time to 50 ms and monitor multiple VRRP group.
A . True
B . False
Answer: A
Leave a Reply