Posted by: Pdfprep
Post Date: November 12, 2020
Complete the sentence. A server consolidation project that does not change the operating characteristics of the applications would require _____.
A . a complete ADM cycle
B . a complete re-architecting change
C . a full revision of the enterprise architecture
D . an incremental change
E . a simplification change
Answer: E
Leave a Reply