An active-active disaster recovery solution configuration needs to be done after the acceptance test.
Which of the following acceptance scenarios business should not be affected? (Multiple choice.)
A . Single VIS device failure
B . Single oracle failure
C . A single data center full failure
D . Third-party arbitration array failure
Answer: A,B,C,D