Posted by: Pdfprep
Post Date: December 14, 2020
You are in the testing phase of a newly deployed NVMe over Fibre Channel (NVMe/FC) SAM environment using Asynchronous Namespace Access (ANA). You are unable to successfully fail over a workload.
In this scenario, which action should you perform?
A. Verify that the DM-Multipath driver is configured for ANA.
B. Verify that the host operating system version supports ANA.
C. Verify that multi-initiator zoning is configured on the FC switches.
D. Verify that the NVMe/FC host utilities kit is installed for ANA.
Answer: A
Leave a Reply