Posted by: Pdfprep
Post Date: November 16, 2020
In a Scrum retrospective, which of the following categories are used to classify the feedback from the team?
A . Direct and indirect
B . Pros and cons
C . Pluses and minuses
D . Likes and dislikes
Answer: C
Leave a Reply