Posted by: Pdfprep
Post Date: October 30, 2020
According to Department of Defense regulations, if classified material is removed from the facility for destruction, it should be destroyed:
A . The same day it was removed
B . Within two days
C . Within three days
D . Within one week
E . Within ten days
Answer: A
Leave a Reply