Given this information, which of the following is the SLE?

Posted by: Pdfprep Category: SY0-501 Tags: , ,

An organization is looking to build its second head office in another city. which has a history of flooding with an average of two floods every ‘100 years. The estimated building cost is $1 million. and the estimated damage due to flooding is half of the buildings cost.

Given this information, which of the following is the SLE?‘
A . $50,000
B . $200000
c. $500,000
C . $1.000000

Answer: C