Posted by: Pdfprep
Post Date: November 21, 2020
Assuming a user has the capability to edit reports, which of the following are editable?
A . Acceleration, schedule, permissions
B . The report’s name, schedule, permissions
C . The report’s name, acceleration, schedule
D . The report’s name, acceleration, permissions
Answer: B
Explanation:
Reference: https://docs.splunk.com/Documentation/Splunk/8.0.3/Report/Createandeditreports
Leave a Reply