SIMULATION
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to schedule the Material Requirements Planning (MRP) master plan to run nightly at 03:00 (UTC-8).
To complete this task, sign in to Dynamics 365 portal.
Answer: You need to configure a batch job to run the master plan nightly.
Create the batch job