Posted by: Pdfprep
Post Date: October 26, 2020
Refer to the exhibit.
A network administrator needs to deploy AOS-Switches that implement port-based tunneled node. Their Aruba controller has IP address 10.1.10.5/24. The architect has assigned tunneled-node endpoints to VLAN 20.
What is one issue with the current configuration planned for VLAN 20 on the switch?
A . VLAN 20 must have GRE enabled on it.
B . VLAN 20 cannot have an IP address.
C . VLAN 20 must have an IP address in the same subnet as the controller.
D . VLAN 20 must not enable jumbo frames.
Answer: D
Leave a Reply