Posted by: Pdfprep
Post Date: November 12, 2020
The project scope can be determined from three aspects.
Which of the following is not included?
A . Functions and modules to be realized by the project
B . Geographic range of the network
C . Investment budget of the project
D . Responsibility division between the project and other matching systems
Answer: C
Leave a Reply