Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.
A network administrator is trying to create multiple overlays on a single physical interface on an Edge. The administrator is able to bring up only a single overlay so far, but is having trouble with bringing up additional overlays.
What could be the possible reason?
A . The administrator does not have the right permission to create multiple overlays. The administrator needs to have an Operator-level privilege for this task.
B . On the WAN overlay configuration, verify the IP address, next-hop, and the VLAN ID configuration.
C . The licensing does not support multiple overlays on a single physical interface.
D . Multiple overlays cannot be created on a single physical interface. Multiple physical interfaces are needed.
Answer: C
Leave a Reply