What is the total GHz processing capability of two blade servers?

Posted by: Pdfprep Category: DES-2T13 Tags: , ,

Review Case

Refer to Case 3.

You are sizing the compute capacity of blade servers in a converged infrastructure solution with the following specifications:

• Number of cores: 12

• Processor speed: 3.1 GHz

• Utilization percentage: 70%

What is the total GHz processing capability of two blade servers?
A . 28.4
B . 31.6
C . 52.0
D . 75.6

Answer: C

Explanation:

processing capability= cores x processor speed x percentage use

pc = 12 x 3.1 x 0.70 = 26.04 x 2 blades = 52.08